bathroom before and after

These pictures help to show one of the common situations we come across – Leaks.
On entering this particular bathroom there was a musty damp smell, but no visible problems.
After removing the bath panel we found a black, damp floor area. This was due to a slow leaking shower running in between the stud partition wall.  The damage was considerable, considering the house was not very old.
This was a perfect time for the owners to upgrade to their dream bathroom.
Firstly the bathroom was stripped, at which time we discovered the damage had reached the adjacent room.  We removed all flooring and walls and set about renovating the bathroom.
Our newly designed bathroom included moving the plumbing in the bath for a more spacious shower stand area.

  • New chrome downlights
  • Extractor fan
  • Taps with hand shower
  • Chrome towel radiator
  • New tiling walls and floor

The damp problem was solved using high quality adhesives and grout – which is used as standard.
Another extremely satisfied customer.

tile in style bathroom conversion process